Logan Memorial Education Campus Phase 1, TK-8

Student Centered Learning

The 137,000 s.f. Logan Memorial Educational Complex, TK-12 grades, rebuilds the existing K-8 campus and adds a new high school component that this neighborhood has been missing. This complex will be developed as a walkable neighborhood learning center, engaging parents and inspiring students. Student-centered learning environments have been designed to support, hands-on learning, teamwork, critical-thinking and problem solving skills. Our focus on this project was to design, select and implement FF&E solutions to bring these goals to life. Phase I of the project was the 56,000 s.f. K-8 buildings and was completed in early 2021. The 9-12 campus is currently under construction

Client:

Category:

Location:

Share: