ID Studios Participated in Tables for Tots

Swinerton Builder’s San Diego office was featured at the 2013 Energy Summit at Stanford this past June. Here’s a video of the presentation!
4b. Panel – Pioneering Net Zero Energy Commercial Building | Silicon Valley Energy Summit – June 28, 2013 from Cyperus Media.com on Vimeo.
ID Studios has completed Tenant Improvement Design, Construction Documents and FF&E design for Perkins Coie’s new office located in the Del Mar Gateway building.
ID Studios scope included both renovation of existing floor plus expansion onto a new floor, for a total of approx. 24,000 SF. The design concept was based on creating a “fresh” modern and timeless interior to create a local, welcoming feeling for this international law firm. The natural white stone and warm grey-brown flooring create a strong base for the bright white walls and warm wood millwork & ceiling features, mixed with various glazing systems to allow the quality of natural light to filter throughout the space. The project includes a new reception, conferencing rooms, and multipurpose room to allow for meetings, training and events, break rooms, offices, plus renovation to full existing floor.
ID Studios also worked closely with client to create the “fresh” palette through modest accents of blue & green through the interior features, FF&E upholstery and artwork.
The ID Studios Team includes Amy Morway, Lori Hagen-Hulitt and Megan Hearon.